Flowline Dress
Offers for youSave up to ₹500 on this order
A sleeveless midi dress with a clean, elongated silhouette that gently skims the body for a refined, flattering fit. Designed with a high neckline and a concealed back zipper for a seamless finish, it features side slits on both sides—with a shorter slit on the left and a higher slit on the right—adding ease of movement while creating a subtle, contemporary detail. Minimal in design yet effortlessly elegant, it's a piece you'll reach for from morning meetings to evening dinners.
Crafted in the same signature Modal Viscose (60% Modal, 40% Viscose) fabric that has become a favourite across our collections, it is exceptionally soft, breathable, and lightweight. The modal lends a smooth, fluid drape while the viscose enhances its softness, creating a fabric that feels cool against the skin and comfortable through long hours of wear. Non-sheer and beautifully fluid, it's designed to move with you while maintaining its elegant shape.
Style it with heels and delicate jewellery for an elevated evening look, or pair it with flats and an oversized shirt or light jacket for effortless daytime dressing. Timeless, versatile, and thoughtfully designed, it's the kind of wardrobe staple you'll wear season after season.
Details
Length: 52 inches
Fabric Composition: 60% Modal, 40% Viscose
Color: Black
Model: Wearing size XS | Height: 5'8"
Washing Instructions: Hand wash or machine wash cold, inside out, with mild detergent. Wash with like colors. Do not soak. Dry clean recommended.
Product Code: BR25-93
Net Quantity: 1N
We currently offer free shipping* across India. International shipping is not available at this time.
Processing & Delivery Time
- Ships within 2 - 3 business days.
Delivery timelines may vary due to factors beyond our control, such as weather conditions, public holidays, or courier delays.
View Full Policy
RETURN & EXCHANGE
Changed your mind? No problem! You have 10 days to return or exchange—easy and effortless, just the way it should be.Sale items are non-returnable and non-refundable. Size exchanges are allowed, subject to availability. If unavailable, store credit will be issued.
Manufactured and Marketed By: Sana Gupta Retail Pvt. Ltd.
Country Of Origin: India
The colour of the product may vary slightly from how it appears here. This may be due to different display settings on various devices and also because of any lighting filters or special effects used during the shoot.
